[1]
Acar Yildirim, H. and Akcay , C. 2019. Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach. Revista de la Construcción. Journal of Construction. 18, 3 (Dec. 2019), 554–567. DOI:https://doi.org/10.7764/RDLC.18.3.554.