Acar Yildirim, H., & Akcay , C. (2019). Time-cost optimization model proposal for construction projects with genetic algorithm and fuzzy logic approach. Revista De La Construcción. Journal of Construction, 18(3), 554–567. https://doi.org/10.7764/RDLC.18.3.554