[1]
A. Andrade, A. Rivera, S. Saigua, T. Castillo, and A. Zárate, “Consequences in cost and time in construction projects due to the low level of BIM methodology use”, RIC, vol. 39, no. 2, pp. 151–160, Aug. 2024.